Leading manufacturer and supplier of ready mix concrete, liquid screed and concrete pumps for the South West
  • Wide range of pumps
  • Saves time and reduces manpower
  • Extensive reach pipes
  • Request a quote

Concrete Pumping

Does your project require a concrete pump? If so, we can help. We have a wide range of concrete pumps for hire, including the largest concrete pump in the UK at 62 metres and the boomless minipump, for delivery to those especially difficult to access lay sites.

Concrete pumping is available alongside our ready-mix concrete delivery service, so you can order both from a single supplier and coordinate the pour as one job. If you're comparing concrete pump rental options, our team can talk you through which pump suits your site before you book.

Whatever your requirements, we have a concrete pump that can effectively supply you with ready-mix concrete and screed, so don't hesitate to contact us on 0117 958 2090.

What Is Concrete Pumping?

 

Concrete pumping is the delivery of wet concrete from the mixer truck to the point of pour through a pipeline or hose, using mechanical or hydraulic pressure rather than wheelbarrows, chutes or skips. It's the standard method on sites where the pour location can't be reached directly by a ready-mix truck, where the pour is elevated, or where the volume and timescale make manual placement impractical.

You'd typically specify a concrete pump over a standard ready-mix delivery when there's restricted site access, a first-floor or upper-level pour, a large-volume commercial slab, or a lay area some distance from where the truck can park. For smaller domestic jobs with reasonable access, a direct ready-mix delivery may still be the simpler option. Our team can advise on this when you call for a concrete pump rental quote.

Wright Readymix operates its own fleet, so concrete pumping and concrete pump rental are managed in-house rather than subcontracted, from initial enquiry through to pump positioning on site.

Wright MiniMix - Concrete Pumping Services

Wright MiniMix - Concrete Pumping Services

Types of Concrete Pump

 

We operate three types of concrete pump; each suited to different site conditions:

Boom Pumps

Truck-mounted, with a hydraulic arm that places concrete directly at height or over obstacles. Boom pumps are the right choice for large-volume commercial pours, multi-storey work, or sites where the pump can't get close to the pour point.

Line Pumps (Ground Line Concrete Pumps)

Trailer-mounted units connected to a flexible hose rather than a boom. Line pumps are widely used for domestic pours, slabs, floors, and tight-access sites where a boom pump can't set up. If you're looking for concrete line pump hire specifically for a domestic or access-restricted job, this is usually the right pump.

Minipumps

Minipumps are compact, trailer-mounted units built for small domestic pours, garden access, and narrow driveways where even a line pump is too large.

Between these three, we cover the full range of concrete pumps for hire, from large commercial boom work through to the smallest domestic concrete pumper jobs, whichever type of concrete pumping your site needs.

What is a Concrete Pump?

 

A concrete pump is a machine used for transferring wet ready-mix concrete or liquid screed to the lay site. There are two types of concrete pump.

Boom Pumps for Hire

Boom concrete pumps use a robotic arm to deliver ready-mix concrete and screed accurately and are popularly used on large construction sites due to their ability to pump large volumes of concrete quickly.

concrete boom pump installing concrete at home

concrete boom pump installing concrete

Ground Line Pumps for Hire

Ground line concrete pumps such as our boomless minipump, lack this robotic arm and instead rely on laying pipes from the vehicle to the lay site. Our minipump is developed specifically so that it can deliver liquid concrete over 500m vertically as well as 200m horizontally.

Unsure which kind of concrete pump truck you'll require for your project? We're happy to help! Contact us on 0117 958 2090 with any enquiries. You can also read our complete guide to concrete pumping.

wright minimix minipump

ground line concrete pump with underfloor heating

How Concrete Pumping Works

 

Every job pumping concrete follows broadly the same sequence on site. The pump is positioned and set up first. For a boom pump this means levelling the outriggers and checking swing clearance; for a ground line concrete pump it means running the hose from the pump to the pour point and securing each joint. The pump is then connected to the mixer truck, and the mix is fed through the hopper.

Once pumping starts, the concrete moves continuously through the pipeline or hose to the point of pour, allowing a steady, controlled placement rather than repeated trips with a skip or barrow. Our operators manage the pour rate to match what the ground team can place and finish. After the pour, the line is cleaned down and flushed before the pump leaves site, which prevents blockages and protects the equipment for the next concrete pumper job.

We run this concrete pumping process on jobs across the South West and South Wales, from single-pump domestic slabs to larger multi-pump commercial pours.

What Affects the Cost of Concrete Pump Hire?

 

Concrete pump prices depend on several factors specific to the job, rather than a single fixed rate:

  • Pump Type: A boom pump costs more to mobilise than a line pump or minipump, reflecting the size of the vehicle and set-up time.
  • Volume: The amount of concrete being pumped affects how long the pump is on site.
  • Access and Hose Run: Restricted access or a long horizontal or vertical run from pump to pour point adds set-up time and pipework.
  • Duration: A single short pour costs less than a job requiring the pump to stand by for a longer or staged pour.
  • Location: Site distance from our Avonmouth plant is factored into the quote.

We don't publish fixed concrete pump prices on this page because they vary by job. Call 0117 958 2090, and we'll give you an accurate cost based on your site and pour.

Our Concrete Pumps

 
  • The Mini Pump
  • Sermac Zenith 42921 – 4 sections / 21m vertical reach, Sermac Extreme 3Z22 – 3 sections / 22m vertical reach
  • Sermac Extreme 4Z26 – 4 sections / 26m vertical reach, Sermac Extreme 5Z32 – 5 sections / 32m vertical reach x2
  • Sermac Extreme 5Z37 – 5 sections / 37m vertical reach, Sermac Scorpio 5R47 – 5 sections / 47m vertical reach
  • Mecbo AUT PA/24.4 – 4 sections / 26m vertical reach
  • CIFA K41L XRZ – 5 sections / 41m vertical reach
  • M60/K2 – 6 section / 40-62 metre vertical reach x2

concrete boom pump installing concrete on multi storey

Areas We Cover

 

We supply and pump concrete across the South West and South Wales, from our Avonmouth base out to Bristol, Bath, Gloucester, Swindon, Plymouth, Dorset, Poole, Bournemouth, Southampton and Swansea, plus Newport, Cardiff and the wider South Wales region.

Whether it's a domestic slab or a large commercial pour, we can get a concrete pump and crew to your site. If you're outside these areas, get in touch, as we cover a wider radius for larger jobs and can advise on the best option for your location. Discover the full list of areas we cover on our website.

Why Wright Readymix?

 

Wright Readymix runs its own fleet of ready-mix and concrete pumping vehicles, so your job is handled in-house from booking through to pour, not passed to a subcontractor. We've supplied concrete pumps to sites across the South West and South Wales for years, from small domestic slabs to large commercial pours, and our operators know what's needed on site before they arrive.

Need a concrete pump for your project? Call us on 0117 958 2090 or request a quote through our website today.

Concrete Pumps FAQs

 

If you have any questions about a concrete pump or the concrete mixes we supply, contact us. Or you can check out some of the frequently asked questions below. Hopefully they can help you and if not, our concrete specialists will be more than happy to help.

The type of pump that is best for concrete delivery will depend on the specific needs of your construction project.

Boom pumps are better for high-volume or vertical pumping and are typically used for larger construction projects, such as high-rise buildings, bridges, and large slabs

Ground line pumps use flexible hoses to pump concrete to hard-to-reach areas, including underground. These pumps are ideal for smaller construction projects, such as residential homes, patios, and paths.

When you hire a concrete pump from Wright Readymix, you also get a fully trained, CPCS qualified concrete pump operator. 

This is a nationally recognised qualification, and all our pump operators are highly experienced and can provide you with information and advice on how and where to place the concrete pump machine.

We deliver concrete pumping services to a number of areas throughout The South, Wales, and Midlands. If you are outside of one of our areas, we can cross hire pumps on our behalf in order to meet your requirements.

Our innovative minipump is a ground line pump, where 40m of piping (unless you require more) is laid along the ground to where the concrete needs to be pumped. When affixed to scaffolding, this pump is also capable of pumping concrete over 100m vertically and 200m horizontally.

Here are the basic steps of how a concrete pump works: 

  1. The concrete pump is set up on the construction site, and the operator connects the hoses to the pump and the placement area. 
  2. The concrete mixer truck or batch plant mixes the concrete, and the mixture is poured into the hopper of the pump. 
  3. The pump's hydraulic system creates pressure, which forces the concrete through the delivery system, which consists of a series of pipes and hoses. 
  4. The operator controls the flow rate of the concrete and directs the placement of the concrete by manipulating the boom arm or hose. 
  5. Once the concrete has been placed, the operator shuts off the pump and hoses, and the pump is cleaned and prepared for the next job. 

You will need to let us know the volume of concrete you need to pour, as well as timescales and layout of the project, plus any access issues. This will allow us to determine the best concrete pump to meet your needs. 

If you are concerned about anything, our team will be more than happy to answer any enquiries, or check out our concrete pump terms and conditions of supply and hire page for more information.

Please note that it is the customers responsibility to provide a suitable area or washout receptacle for our pump hopper (which contains product leftovers) on site. Waste disposal is not a part of the service that we provide. The pipe line will also require cement for grouting before pumping can begin.

For more information, refer to our terms and conditions.

Some things are simply environmental factors outside of your control. There must be suitable ground conditions for our pumping vehicles and wind speeds must be within safe limits.

You can ensure our concrete pumping process is safe and efficient by clearing obstructions over the placing area and around the site. Check out our page on health and safety guidance for more details.

We have a broad range of concrete pumps available, from 20m boom pumps to the largest concrete pump in the UK, with a 62m reach. We have ground line minipumps which come with a 40m standard kit, or, for additional charges, extra line can be organised if needed.

When affixed to scaffolding, this can also pump over 100m vertically and 200m horizontally.

Yes. Thanks to its remote controlled, extendable arm, a boom pump can be used to pump concrete in areas a ground pump can't reach, such as up and over fences and houses.

Yes. A ground line pump has a lengthy pipeline that can easily snake through the front door, through your house, and out into the garden if required.

The average output of a concrete pump is anywhere between 50 - 180 m3 per hour, depending on the size and power of the pump. 

In general, the larger the pump, the faster it works - for example, our 6-section M60 & M62 boom pumps can pump an outstanding 180 m3 per hour, meaning it has the highest output of any pump in the UK!

Yes, but you’ll need to take some precautions ahead of time. Fresh concrete can freeze at -4°C, so take steps to keep it warm if you’ll be working in sub-zero temperatures. You can do this by insulating the pipes and drums of the pump system via foam tubing and using very hot water in the mixing stage.

If the mixture does freeze whilst pumping, switch off all equipment and give it enough time to defrost before cleaning out any remaining mix. Trying to pump with frozen concrete in the boom may permanently damage the machinery.

Helpful Documents

 

We are the right people for you – let’s work together!
Contact us on 0117 958 2090 today to get a quote or to find out more.


We are proud to offer our concrete pumping services across a number of locations, including: Bristol, Newport, Cheddar, AvonmouthBath, Frome, Weston-super-mare, Birmingham, Gloucester, Swindon, Plymouth, Dorset, Poole, Bournemouth, Southampton, Milton Keynes, Oxfordshire, South Wales, Swansea, Northamptonshire, Chippenham, Reading, Cheltenham, Glastonbury, Taunton, ExeterPlymouthCardiffPenzance, Falmouth, Truro, St Austell, Newquay, Yeovil, Torquay, Exmouth, Bude, Barnstaple, Bideford, Weymouth and Minehead

News
What Is the Best Aggregate for Driveways & Shed Bases?
29th July 2026

The driveway looked good going down. The gravel was the right colour, the edging was straight, and the whole job was done in a day. Six months later, the sub-base had shifted, the surface was rutting under the car, and the whole thing needed lifting. The aggregate itself was fine. The problem was what went under it.

Choosing the best aggregate for driveways and shed bases is not complicated, but it does require knowing what each material is actually for. Load-bearing and drainage drive every decision. A vehicle-trafficked surface needs a sub-base that compacts hard and locks under repeated weight. A shed base needs a platform that sheds water and holds level. Get either wrong and no amount of careful finishing saves it.

This guide covers the materials that matter, the depths that work, and the mistakes that cost people twice.

What Type 1 & Type 2 Aggregate Do Differently

Type 1 and Type 2 are both unbound granular sub-base materials. They behave differently under load in ways that matter to anyone building a driveway.

Type 1 is well-graded crushed stone with a controlled proportion of fines that lock it together under compaction. That is the source of its load-bearing strength and why it is the standard sub-base for vehicle-trafficked surfaces. Construction Industry Research and Information Association's (CIRIA) susdrain guidance confirms that Type 1's high fines content makes it sensitive to moisture changes and largely impermeable, compared with open-graded materials chosen specifically to provide open voids [1].

Type 2 has fewer fines and compacts less tightly. It has a place under light pedestrian paving or as a drainage layer where water movement matters more than bearing capacity. Under a driveway, it is the wrong choice.

When To Use Type 2 Instead

Type 2 earns its place beneath soakaways, around French drains, or as an open-graded fill in a permeable driveway system. For any surface a vehicle will cross, Type 1 is correct. Using Type 2 beneath a driveway is a common and expensive mistake.

What Gravel Actually Stops a Driveway from Moving

A loose-gravel driveway that migrates onto the pavement or churns into ruts has almost always been built with the wrong material or a skimped sub-base. The surface gravel is rarely the issue. The problem sits underneath it.

Surface material matters too. Rounded materials like pea shingle roll against each other and never truly interlock. Angular crushed stone grips; compact it properly, and it holds position under wheel loads.

Ministry of Housing, Communities and Local Government (MHCLG) guidance on permeable surfacing of front gardens sets out the correct build sequence. It specifies a geotextile membrane at the base, a minimum 200mm of compacted open-graded sub-base, then approximately 50mm of decorative gravel at the surface. Conventional Type 1 contains sand and silt that blocks water movement, which is why open-graded materials are used in permeable systems instead [2].

Since October 2008, any impermeable front garden driveway over 5 square metres needs planning permission unless water drains to a permeable area. Gravel is permeable and does not trigger this. Ten-millimetre angular gravel gives a tighter finish underfoot; 20mm drains better and holds more effectively under tyres.

On softer or clay ground, the depth and specification for a sub-base changes. The same principles apply when choosing aggregates for hardscaping projects, where drainage and load-bearing sit alongside aesthetic choices.

Our aggregate and gravel range is available in bulk bags with delivery across Bristol, Bath, Cheddar, Avonmouth, Newport, and the wider South West.

How Thick a Gravel Base Actually Needs to Be for A Shed

The shed base that fails is almost always one that was compacted by someone standing on it and deciding it felt firm enough. It never is. Ask any groundworker who has lifted a sunken shed six months after the pour.

For a standard timber shed, work through the sequence in order:

  • Excavate topsoil down to firm ground and lay a weed membrane.
  • Add compacted Type 1 sub-base across the full footprint.
  • Top with levelled 20mm angular gravel, extended 50mm beyond the walls.

The Planning Portal's guidance on outbuilding foundations confirms that soil type is a significant factor in both depth and design. Clay soils expand and contract with moisture changes, affecting base performance over time. On firm ground, 100mm of compacted Type 1 is the working minimum; 150mm on soft or clay ground, or for heavier structures [3].

Gravel Base or Concrete: Which Is Right for A Shed?

Gravel drains freely, installs quickly, and needs no curing time. On soft ground, sloping sites, or under a heavy structure, a concrete slab is the more reliable choice. What neither will forgive is poor compaction. Compact in layers, check for level in both directions, and get it right before the shed goes on.

If you are moving from a gravel base to a concrete slab, the preparation sequence changes. Laying concrete correctly starts well before the truck arrives. The sub-base condition, formwork, and weather all affect the finished result.

The Decisions that Hold

Most driveway and shed base failures trace back to one of three choices made early in the job. Wrong sub-base material, rounded stone where angular should have gone, or a base compacted by eye rather than by depth. None of these mistakes is obvious at the time. They show up six months later, once load and water have done their work.

The three things that matter most:

  • Type 1 sub-base compacts hard and carries load; Type 2 does not.
  • Angular gravel interlocks under traffic; rounded stone migrates.
  • Compacted depth, not decorative depth, keeps a base level long-term.

Wright Readymix supplies 17 aggregate and gravel options in bulk bags, delivered across Bristol, Bath, Avonmouth, Cheddar, Newport, and Weston-super-Mare. The team can advise on material selection before you order, whether for a driveway, a shed base, or a larger groundworks job.

Call 0117 958 2090 or get in touch to discuss your aggregate requirements.

External Sources

[1] Construction Industry Research and Information Association (CIRIA), Structural Performance: https://www.susdrain.org/delivering-suds/using-suds/suds-components/source-control/pervious-surfaces/pervious-surface-types/structural-performance.html

[2] GOV.UK, Ministry of Housing, Communities and Local Government (MHCLG), Guidance on the Permeable Surfacing of Front Gardens (2026): https://www.gov.uk/government/publications/permeable-surfacing-of-front-gardens-guidance/guidance-on-the-permeable-surfacing-of-front-gardens

[3] GOV.UK, Planning Portal, Building Regulations: Foundations: https://www.planningportal.co.uk/permission/common-projects/outbuildings/building-regulations-foundations

Read more
Does Hot Weather Affect Curing a Concrete Shed Base?
15th July 2026

A hot spell might feel like ideal pouring weather, but it is exactly when curing a concrete shed base gets hardest to do properly. Heat pulls moisture from the surface faster than the concrete underneath can build strength, so a slab that looks dry by lunchtime can still crack within the week. Leave it uncovered on a warm afternoon, and you risk plastic shrinkage cracking, a soft core under a hard crust, or a slab that fails months later.

None of that is inevitable. Get the concrete for a shed base right at the ordering stage, then time the pour and protect the surface while it cures. Do this and you’re assured of a summer pour holds just as reliably as one poured in spring.

The difference between a base that lasts and one that cracks comes down to a handful of decisions made on day one.

Why Hot Weather Speeds Up Drying without Speeding up Strength

Heat, wind and low humidity all pull moisture out of a slab faster, but the concrete underneath still needs its full curing time to gain strength. That mismatch, a dry crust over a soft core, is what causes plastic shrinkage cracking on shed bases poured in summer. Higher temperatures also speed up cement hydration, giving a slab that feels strong early on at the cost of its long-term strength.

This summer has already brought a run of exceptional heat. The Met Office confirmed a record eight days above 34°C this year, the first on record with 35°C readings across May, June and July. A shed base with no shade will run hotter still [1].

BS 8500 sets a 35°C limit on concrete temperature at discharge for three reasons [2]:

  • Loss of workability, making the mix harder to place and compact.
  • Faster evaporation than strength gain, causing shrinkage cracks.
  • Thermally induced stress as the slab cools, raising cracking risk.

Why Fast Surface Drying Isn't Fast Curing

Wind and low humidity make the evaporation problem worse still, since both speed up moisture loss regardless of the air temperature. The mechanics of how concrete cures don't change with the weather; only the timing does.

Time Your Pour Before the Sun Gets to It

The biggest lever you have over hot weather curing is when you pour. The British Ready-Mixed Concrete Association’s (BRMCA) practical guide for site personnel sets a two-hour limit between loading and placing ready-mixed concrete, shorter still in hot weather. Heat speeds up how fast the concrete loses workability, so a stiff mix at the chute is one you're fighting rather than placing [3].

Shed bases aren't the only pour that suffers in this weather. The same discharge window and admixture questions apply to any pour scheduled during a heatwave.

However, if it's a scorching day, ask your supplier whether the load needs a retarding admixture at the plant to buy more working time. Flag it if your mix is air-entrained too, since entrained air turns unstable above 30°C, five degrees below the general limit, so delivery temperature needs tighter control.

Order for early morning delivery, as the concrete's most vulnerable hours land before the day's heat peaks rather than during it. Get the site ready before the truck is due, and the early-morning slot does its job properly.

A few things are worth locking down before the truck arrives:

  • Confirm your delivery slot for early morning, before eight.
  • Have shading or covers ready before finishing work is done.
  • Ask your supplier if a retarding admixture is worth adding.

None of this changes the mix itself. It just buys the concrete time to cure before the heat starts working against it.

Protect a Freshly Poured Base While It Cures

Once the base is placed, the job is keeping moisture in, not adding more on top. Covering the slab, shading it and controlling rewetting keeps enough water in the mix to cure properly, not just look dry on top.

Good curing, not a stronger mix, reduces drying shrinkage cracks, according to the Concrete Society, by giving the concrete more time to build strength before it dries out. Shrinkage happens in the cement paste, not the aggregate, which is why managing how it dries does more to prevent cracking than anything added to the mix [4].

3 Habits That Undo an Otherwise Good Pour

  • Hosing the surface down mid-afternoon to cool it off.
  • Leaving the sheeting off overnight because the day felt cool enough.
  • Removing formwork early because the surface looks set.

If this is a first shed base pour, our guide on preparing a shed base covers prep done for April conditions rather than August ones.

Getting It Right Despite the Heat

Before this, hot weather curing probably looked like one more risk on a job you were already unsure about. After it, the plan is straightforward, and it comes down to three habits rather than luck. Follow them, and a slab poured in August cures just as reliably as one poured in April, only with more attention along the way.

The steps that matter most:

  • Pour first thing in the morning, before the heat builds.
  • Cover the base and keep the sheeting on overnight.
  • Leave the hose alone, however dry the surface looks.

Wright Readymix has supplied ready-mixed concrete and advice on jobs like this across the South West and South Wales for years, from small domestic pours to full commercial slabs. Our team talks through mix, volume and delivery timing before you book, then follows through on delivery day too. That matters most when the weather is working against the pour rather than with it.

Call 0117 958 2090 or get in touch to talk through timing and delivery for a shed base pour in hot weather.

External Sources

[1] GOV.UK, Met Office, Heatwave Continues as UK Records Unprecedented Run of 35°C Days (2026): https://www.metoffice.gov.uk/about-us/news-and-media/media-centre/weather-and-climate-news/2026/heatwave-continues-as-uk-records-unprecedented-run-of-35c-days

[2] Concrete Society, Hot Weather Concreting (2025): https://www.concrete.org.uk/fingertips/hot-weather-concreting/

[3] British Ready-Mixed Concrete Association (BRMCA), Ready Mixed Concrete – Practical Guide for Site Personnel (2017): https://brmca.org.uk/documents/BRMCA_Ready_Mixed_Concrete_Practical_guide_October_2017.pdf

[4] Concrete Society, Reducing Drying Shrinkage Cracks (2025): https://www.concrete.org.uk/fingertips/reducing-drying-shrinkage-cracks/

Read more
How to Clean a Concrete Driveway & Remove Oil Stains
17th June 2026

The car is sold, moved on, or replaced, and what’s left behind is a dark patch that wasn't there before. Months later, it’s still there, slightly duller than the surrounding concrete, no matter how many times a hose has been run over it. A driveway like this is one of the first things anyone notices, whether that’s a visitor, a neighbour, or a buyer looking round a property.

The good news is that most of it comes off. A clean concrete driveway is achievable with a methodical approach, using the right method for the right stain and starting gently before working up. Anyone weighing up concrete for driveways that resists staining from the outset might find that worth a look too.

Here is what actually works, stain by stain.

Common Types of Concrete Driveway Stains

The three stains you are most likely to be dealing with are oil and grease, rust, and general dirt with moss or algae. Each behaves differently once on concrete, which affects how you tackle it.

Oil and grease are the trickiest because concrete is so porous. According to Which?, this high porosity makes concrete the hardest surface type to clean, allowing stains to work their way deep into the surface, which is why a fresh spill that looks easy to wipe up can leave a shadow behind weeks later. Rust marks usually come from metal garden furniture, tools, or a car jack left in the same spot for too long, and they tend to sit closer to the surface than oil [1].

Dirt, moss, and algae build up over time in shaded or damp areas and are mostly surface issues rather than penetration issues. Stubborn black spots from lichen that thrives in moist conditions can be more resistant and may need repeat treatment.

The driveway needs different things depending on which of these you are dealing with:

  • Oil and grease stains need to be absorbed first, then a degreaser is applied multiple times.
  • Rust marks respond well to a rust-specific remover applied directly to the mark.
  • Moss, algae, and dirt usually lift with a stiff brush, detergent, and a rinse.

How To Remove Oil Stains from Concrete

The most reliable approach to oil stains starts gently. If the spill is fresh, the first job is to stop it from spreading and soaking in further, so blot it with an absorbent material like cat litter or sawdust rather than wiping it across the surface.

For older stains, household products are worth trying before reaching for anything stronger. Squirting washing-up liquid into a bucket of warm water, pouring it onto the affected area, and scrubbing with a broom before rinsing thoroughly is a method some people swear by. Baking soda mixed into a paste and left on the stain for a few hours before scrubbing can also help draw oil out of the surface.

Why Oil Is So Hard to Shift Once It's Set In

Once oil has had time to soak into the concrete, it bonds with the material at a level a surface wipe cannot reach. A concrete-safe degreaser, applied as the manufacturer instructs and left to work before rinsing, is designed to break down oil that has penetrated rather than just sitting on the surface.

Stubborn or older stains rarely lift in one go. Repeating the treatment, sometimes two or three times over a few days, gradually draws more oil out with each application. If a small domestic patch is part of a wider project, our DIY concrete page covers what is involved in replacing a section rather than just how to clean it.

Pressure Washing Tips for Concrete Driveways

A pressure washer can help with general grime and can assist with oil and rust once the stain has already been treated, but it is not a stain remover on its own, and the wrong technique can do real damage to the surface. Getting the settings right matters more than the machine's power.

For concrete and brick, Which? recommends the following settings and technique:

  • Use a 15-degree nozzle with a pressure setting of 2,500 to 3,000 PSI.
  • Start with lower pressure and test a small area first.
  • Work in a consistent sweeping motion, taking care around softer or damaged bricks.

Pressure washing is most useful as a finishing step, after a degreaser or detergent has already broken down the stain. Used that way, it rinses away loosened dirt and residue without forcing reliance on raw pressure to shift the mark itself [2].

What to Avoid When Cleaning Concrete

A few common habits cause more harm than the stain they are meant to fix, and it is worth knowing what they are before you start. The following three mistakes account for most avoidable damage:

  • Going straight to the highest pressure setting without testing a small area first.
  • Using undiluted bleach or strong acidic cleaners, which can etch the surface.
  • Holding the lance too close can dislodge mortar and let weeds establish.

If a cleaned patch ends up looking lighter, rougher, or more porous than the rest of the driveway, one of these is usually the cause. At that point, the best fix is often a sealant over the whole drive to even out the appearance and protect it going forward.

Talk to the Team Before You Decide

A driveway covered in oil stains and old grime can feel like a lost cause, but most of it lifts with patience and the right order of steps. Once it is clean, sealing the surface protects against future spills and keeps the drive looking right for longer.

Wright Readymix has spent years supplying concrete for driveways and domestic projects across the South West and South Wales, and understands the wear that leads to these stains in the first place. If an existing driveway is past the point where cleaning helps, or a new one needs a mix built for durability, the team can talk through the options.

Get in touch to discuss your driveway concrete requirements or call 0117 958 2090 to speak to the team directly.

External Sources

[1] Which?, Danny Dougan, Best Patio Cleaners 2026: https://www.which.co.uk/reviews/patio-cleaners/article/best-patio-cleaners-a8cIA3O3krKQ

[2] Which?, Manca Virant, Common Mistakes To Avoid When Using a Pressure Washer: https://www.which.co.uk/news/article/common-mistakes-to-avoid-when-using-a-pressure-washer-a6q3O7U8gTit

Read more
How to Prevent Air Pockets in Concrete Slabs & Bases
08th June 2026

A concrete slab should be a uniform mass. When air pockets in concrete disrupt that uniformity, the result is a network of weak points distributed throughout the structure. Now, these points may not show at the surface, but they will determine where the slab fails first.

What makes it frustrating is that the conditions producing voids are almost entirely within your control. Mix consistency, pour technique, vibration, and base preparation all play a part, and each is manageable with the right ready mix concrete and the right approach on site.

Here is what you need to know before your next pour.

What Causes Air Pockets in Concrete?

Air pockets, also called voids or entrapped air, form when air becomes trapped inside the concrete mix during or after the pour. Unlike air-entrained concrete, where microscopic bubbles are deliberately introduced to improve freeze-thaw resistance, entrapped air is uncontrolled and damaging.

The most common causes are:

  • Pouring concrete too quickly into the formwork.
  • Using a mix that’s too stiff to flow around the reinforcement.
  • Failing to compact or vibrate the concrete after placement.

Mix consistency matters throughout. A mix that is too dry will not move freely enough to fill the formwork, while an overly wet mix can segregate, with aggregate sinking and water rising to the surface.

Why Air Pockets Lead to Weak Concrete

Voids reduce load-bearing capacity and structural integrity. A slab with internal air pockets is not a uniform mass; it is a series of weak points connected by sound material, and under load, those weak points become the failure points.

For applications such as shed bases and driveways, surface consequences matter as much as structural ones. The Concrete Society (CS) defines honeycombing as coarse, stony areas caused by insufficient fine material, poor mixing, or formwork leakage [1].

Shallow honeycombing is mostly cosmetic, but deeper areas reduce the protection the concrete cover provides to reinforcement, and correction requires increasing the sand and cement content, along with proper mixing and compaction.

Our Newport project where concrete pumping was required in challenging site conditions shows how mix and placement decisions play out together on a real job. It’s a useful reference if you are dealing with access constraints or restricted pours.

How to Prevent Air Pockets During Pouring

Pour in layers rather than placing the full depth in one go. This gives you control and allows each layer to be compacted before the next goes in. Avoid dropping concrete from height; the further it falls, the more likely it is to segregate or trap air on impact.

It is also worth understanding the difference between entrapped air and deliberately entrained air. CS notes that air-entraining admixtures produce small, stable bubbles, mostly below 1mm in diameter, distributed uniformly through the mix to improve freeze-thaw resistance. However, for every 1% increase in air entrainment, concrete strength falls by about 5%. Uncontrolled entrapped air introduces far larger, irregular voids with none of those benefits [2].

The Role of Vibration & Compaction

Proper compaction is the most reliable way to remove entrapped air after placement. CS is clear that concrete not properly compacted will have reduced strength, increased permeability, reduced durability, and surface blemishes, including blowholes and honeycombing. Vibration works by fluidising the concrete, allowing entrapped air to rise to the surface [3].

For in-situ pours, an internal poker vibrator is the standard tool for thick sections. For smaller DIY pours, rodding (working a straight bar up and down through the mix) provides basic compaction; it is less effective than mechanical vibration but significantly better than nothing. On thin slabs, tamping with a straight edge helps consolidate the upper layer and close surface air.

Finishing Techniques to Avoid Surface Defects

The timing of finishing matters as much as the method. Bleeding occurs when mixing water rises to the surface as solid components settle, and it continues until the cement paste stiffens enough to halt the process.

CS identifies two risks with the top surface finish. If bleed water is remixed during finishing, the result is a weak top layer; therefore, finishing should wait until the bleed water has evaporated. If evaporation outpaces bleeding, plastic shrinkage cracking may occur [4].

Screeding should follow immediately after compaction; a bull float is then used in long, overlapping passes, and a broom or trowel finish is applied once the surface has lost its sheen. Avoid overworking the trowel, as it can bring fines to the surface and seal in air just below.

Practical Tips for Better Concrete Slabs

A few consistent habits reduce the risk of air pockets across most pours:

  • Check your base before the truck arrives; soft spots will not compact out.
  • Use a GEN3 or C20 for most domestic bases; stiffer mixes are harder to consolidate.
  • Have compaction equipment ready before the pour starts, not after.
  • Pour at a pace your compaction can keep up with; do not let sections outrun you.

Read the site before booking; access and slope shape how the pour runs.

These are not complicated adjustments, but they are easy to skip under time pressure. The contractors and self-builders who see consistent results are the ones who plan the pour as carefully as they plan the specification. Our testimonials reflect that, time and again, the jobs that go smoothly are the ones where preparation came first.

For projects where standard truck access is not possible, our innovative mini pump handles restricted sites where wheelbarrows cannot reach. So you can keep pour control intact even on difficult ground.

Getting Air Pockets Right Starts Before the Pour

Air pockets do not form by accident. They form when preparation is skipped, the mix consistency goes unchecked, or compaction gets rushed. The result is a slab that looks sound on the day and shows its weaknesses later. Remember, the steps in this guide need to be in place before the truck arrives, not after.

Wright Readymix supplies ready mix concrete and liquid screed to contractors and domestic customers across the South West and South Wales, from five plants with consistent mixes designed for the applications that matter on real sites. Part of The LGW Group, the team is available 24/7 to advise on specification, volume, and delivery logistics.

Call 0117 958 2090 or get in touch to discuss your pour, your mix specification, or anything else you need to get the job done properly.

External Sources

[1] Concrete Society (CS), Fingertips, Honeycombing of Concrete: https://www.concrete.org.uk/fingertips/honeycombing-of-concrete/

[2] Concrete Society (CS), Fingertips, Air-Entraining Admixtures: https://www.concrete.org.uk/fingertips/air-entraining-admixtures/

[3] Concrete Society (CS), Fingertips, Compaction of Concrete: https://www.concrete.org.uk/fingertips/compaction-of-concrete/

[4] Concrete Society (CS), Fingertips, Bleeding and Segregation: https://www.concrete.org.uk/fingertips/bleeding-and-segregation/

Read more